Problems with the Left Bank at Site C

The amazing thing about civil suits is that they tend to bring documents to the light of day that may otherwise never be exposed. Until a determination of their civil claim for Treaty infringement can be determined at trial, West Moberly First Nations have filed an application for an interim injunction to suspend construction on the Site C dam. In that application, we came across the following document: Site C Clean Energy Project - Conditional Water Licences 132990 & 132991 Leave to Construct LTC #01G - Left Bank Excavation Phase 2 Recommendation for Amendment #6 - Redesign of Left Bank Excavation (Affidavit #1 of Robert McCullough see pages 548 to 551) This is a letter dated December 9,

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Wix Facebook page

Give us a call

Ken Boon, President

(250) 262-9014

Address

SS#2, Site 12, Comp 19

Fort Saint John, BC

V1J 4M7

Keep in touch

  • facebook-square

Share our story