SITE C IS SINKING INTO OLD MUD

Open letter to: PREMIER HORGAN, cc. HONOURABLE Eby, HONOURABLE Ralston, HONOURABLE James From: Gramineae Seed Farm Arthur & Laurel Hadland 6750 253 Road, Baldonnel, B.C. V0C 1C2 Phone: (250) 789-3566 Re: SITE C IS SINKING INTO OLD MUD Objective information regarding the geological instability of Site C has been available to decision makers for a long time. Firstly, the 1963 Professional Engineers’ Analysis of the 1957 collapse of the Peace River Bridge identified the Shaftesbury Shales and high rainfall as the prime reason for that failure. Secondly, an excerpt from Klohn Crippen & SNC Lavelin Peace River - Site C Hydro Project Reservoir Shoreline Impacts Methodology and Criteria Report No.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Wix Facebook page

Give us a call

Ken Boon, President

(250) 262-9014

Address

SS#2, Site 12, Comp 19

Fort Saint John, BC

V1J 4M7

Keep in touch

  • facebook-square

Share our story